b'VentilationThe division is committed to continuouslyLRSD made numerous investments in ventilation:improving ventilation in all our schools, and regular maintenance is performed on each ventilation$604,733 Repairs & Maintenancesystem. This was especially important in the context of a global pandemic. All mechanical systems are continuously operating in occupied mode to$35,331 Filters maximize fresh air and have the highest level of air filtration allowable within the manufacturers$109,720HEPA Filters operating parameters of the existing HVAC system. Upcoming and ongoing ProjectsThere are several exciting upcoming capital projects in LRSD including:$2,852,768Shamrock School: $2,400,000 Shamrock School:Building Envelope Roof Replacement$2,250,000 Glenwood School: $1,200,000 J.H. Bruns Collegiate: Elevator, UniversalStructural Roof UpgradeChange Room and Roof Replacement $920,479 Nelson McIntyreCollegiate: $939,493 St. George School:Science Classroom Roof Replacement *Please note that costs for upcoming projects are based on estimations. A New School in Sage CreekIn the summer of 2022, the division received design authorization for a new school in Sage Creek. This is an important next step to ensure construction can begin inMarch 2023 with a target of the new school opening by September 2025 at the latest.Major Addition to Marion School On Track at Collge Jeanne-SauvIn addition to ongoing accessibility updates and renovationsA major addition to Collge Jeanne-Sauv broke ground in to Marion School, the division received authorization from theJune 2022. This includes a two-storey, 16-room expansion Manitoba Government to proceed with the design of a majorwith an elevator, a new science lab, and a fitness facility and addition to the school of approximately 36,000 sq ft. Thisstorage room addition to the gymnasium. It also includes a new includes a new gymnasium, eight classrooms, two Kindergartenteacher collaboration space, a new and expanded music space, classrooms, a 74-seat childcare space, and two before-and- and student breakout spaces. This expansion is on track to be after rooms. This project is currently in the design only phase.completed by September 2023.15'